Project 5: Single Girder Crane and Walkway

 

Company: Dynamic Engineering Steels

Prepared by: Moung Virakboth
Position: Engineer, Structural Design and Construction
Contact: 096 25 33 656 (smart/telegram)


#Single_Girder_Crane_and_Walkway

Problem:

  • Existing cranes have 2 axes (Up & Down, and Front & Back), so when the bag is in the wrong position on the left/right, it's hard to lift.

Solution

  • Change from 2 axes to a single girder crane that has 3 axes (up & down, front & back, and left & right).

Dimension

  • Structure's height = 7 m
  • Structure's width = 5.5 m
  • Structure's length = 15 m

Project Timeline

  • 3 months after purchasing order (PO)




Comments

Popular posts from this blog

Project 04: Material Handling System

Product 01: Boltless ​Rack​ ( ធ្នើរខ្នាតតូច​ )

Project 01: Overhead Crane