Project 24: Ring Pull Warehouse
Company: Dynamic Engineering Steels
Prepared by: Moung Virakboth
Position: Engineer, Structural Design and Construction
Contact: 096 25 33 656 (smart/telegram)
#Ring_Pull_Warehouse
Problem:
- Change machine location.
- Destroy ring pull about 4 tons within 2 months.
Solution
- Build a new warehouse
- Select a shredder machine that is suitable for the requirement.
Dimension
- Structure's height = 5 m
- Structure's width = 8.6 m
- Structure's length = 5 m
Project Timeline