Problem:

  • Change machine location.
  • Destroy ring pull about 4 tons within 2 months.

Solution

  • Build a new warehouse
  • Select a shredder machine that is suitable for the requirement.

Dimension

  • Structure's height = 5 m
  • Structure's width = 8.6 m
  • Structure's length = 5 m

Project Timeline

  • 4 weeks after purchasing order (PO)