Project 10: Crane with Manual Trolley (Hoist 3 tons)
Company: Dynamic Engineering Steels
Prepared by: Moung Virakboth
Position: Engineer, Structural Design and Construction
Contact: 096 25 33 656 (smart/telegram)
#Crane_with_Manual_Trolley_Hoist_3_tons
Problem:
- Need to maintain motor in narrow space that hard to lift this heavy motor.
Solution
- Build a crane structure on top to lift motor 3 tons.
Dimension
- Structure's height = 2 m
- Structure's width = 2.9 m
- Structure's length = 4.3 m
Project Timeline

Comments
Post a Comment