Project 10: Crane with Manual Trolley (Hoist 3 tons)

   

Company: Dynamic Engineering Steels

Prepared by: Moung Virakboth
Position: Engineer, Structural Design and Construction
Contact: 096 25 33 656 (smart/telegram)


#Crane_with_Manual_Trolley_Hoist_3_tons

Problem:

  • Need to maintain motor in narrow space that hard to lift this heavy motor.

Solution

  • Build a crane structure on top to lift motor 3 tons.

Dimension

  • Structure's height = 2 m
  • Structure's width = 2.9 m
  • Structure's length = 4.3 m

Project Timeline

  • 2 weeks after purchasing order (PO)








Comments

Popular posts from this blog

Project 04: Material Handling System

Product 01: Boltless ​Rack​ ( ធ្នើរខ្នាតតូច​ )

Project 01: Overhead Crane