Project 11: Crane with manual trolley (hoist 2 tons)

   

Company: Dynamic Engineering Steels

Prepared by: Moung Virakboth
Position: Engineer, Structural Design and Construction
Contact: 096 25 33 656 (smart/telegram)


#Crane_with_manual_trolley_hoist_2_tons

Problem:

  • The surrounding space is narrow and needs to use 2 forklifts to lift the spare part in the middle of the machine.

Solution

  • Build a crane structure in the narrow space for lifting spare parts 1 ton.

Dimension

  • Structure's height = 4.5 m
  • Structure's width = 5 m
  • Structure's length = 5.7 m

Project Timeline

  • 2 weeks after purchasing order (PO)








Comments

Popular posts from this blog

Project 04: Material Handling System

Product 01: Boltless ​Rack​ ( ធ្នើរខ្នាតតូច​ )

Project 01: Overhead Crane