Project 8: Crane with manual trolley (hoist 1 ton)

  

Company: Dynamic Engineering Steels

Prepared by: Moung Virakboth
Position: Engineer, Structural Design and Construction
Contact: 096 25 33 656 (smart/telegram)


#Crane_with_manual_trolley_hoist_1_ton

Problem:

  • The ammonia motor is heavy to lift (700 kgs).

Solution

  • Build a crane structure for lifting in a narrow space.

Dimension

  • Structure's height = 2.9 m
  • Structure's width = 1.5 m
  • Structure's length = 7.6 m
Project Timeline
  • 2 weeks after purchasing order (PO)





Comments

Popular posts from this blog

Project 04: Material Handling System

Product 01: Boltless ​Rack​ ( ធ្នើរខ្នាតតូច​ )

Project 01: Overhead Crane