Posts

Project 29: Restaurant Decoration Fan

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) #Restaurant_Decoration_Fan Problem: N/A Solution N/A Dimension Structure's height = 9 m Structure's width = 1 m Structure's length = 1 m Project Timeline 2 weeks after purchasing order (PO)

Project 28: Welcome Gate

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) # Welcome_Gate Problem: N/A Solution N/A Dimension Structure's height = 14.5 m Structure's width = 2.2 m Structure's length = 2.2 m Project Timeline 2 weeks after purchasing order (PO)

Project 27: Battery Rack

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) #Battery_Rack Problem: Need to customize the rack to fit the battery and charger. Solution Build a new customize rack. Dimension Structure's height = 1.35 m Structure's width = 0.38 m Structure's length = 1.38 m Project Timeline 4 weeks after purchasing order (PO) for 20 sets

Project 26: Warehouse Construction

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) #Warehouse Construction Problem: N/A Solution N/A Dimension Structure's height = 15 m Structure's width = 25 m Structure's length = 8 m Project Timeline 8 weeks after purchasing order (PO)

Project 25: Container Roof

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) #Container_Roof Problem: Leaking water into the container. Solution Build a roof on the container. Dimension Structure's height = 4.5 m Structure's width = 10 m Structure's length = 14 m Project Timeline 1 week after purchasing order (PO)

Project 24: Ring Pull Warehouse

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) # Ring_Pull_Warehouse Problem: Change machine location. Destroy ring pull about 4 tons within 2 months. Solution Build a new warehouse Select a shredder machine that is suitable for the requirement. Dimension Structure's height = 5 m Structure's width = 8.6 m Structure's length = 5 m Project Timeline 4 weeks after purchasing order (PO)

Project 23: Install Rack and Platform

Image
    Company: Dynamic Engineering Steels Prepared by: Moung Virakboth Position: Engineer, Structural Design and Construction Contact: 096 25 33 656 (smart/telegram) # Install_Rack_and_Platform Problem: Unorganized and waste higher space. Solution Install a rack for heavy goods, and build a platform on the top for light goods. Dimension Structure's height = 4 m Structure's width = 27.5 m Structure's length = 50.28 m Project Timeline 8 weeks after purchasing order (PO)